Article

The Daily RecordThe Daily Record on 2024-05-13 08:57

Claims new power line could be built through Galloway Hills to provide windfarm grid connection

The 20-kilometre scheme could be needed to connect the proposed Blair Hill project to the sub-station at Glenlee

Related news